SCHEDULE RESOURCESThe resources you will need to complete the job and how much they will cost Use this function to list all the resources used within a selected schedule. Main Features
There are several important functions associated with the schedule resources: UPDATE TO CURRENT PRICES This does exactly as it says, updates the selected resource(s) to the latest resource library value. Remember that resources copied from the Resource Library (directly or via the Item Library) are copies of the original and therefore if the original is changed the Schedule copy is not. In most cases this is how most people would want it. This feature is therefore particularly useful for jobs that may have been placed on hold for a period of time and have now been resurrected for final adjustments. RESOURCE REPLACEMENT Try replacing one type of labour resource with another and see the effect. Another time saving feature that's worth mastering. VIEW SETTINGS - UNREFERENCED RESOURCES This feature is useful for showing up resources no longer being used in the Schedule (Items may have been deleted). If there are none in the current Schedule, try loading another. Click on the View Setting button and switch on the Unreferenced Resources option. All unreferenced resources are highlighted with a blue background. These can be deleted from the list if required. Note: your setting is kept for all tables using this feature until you switch it off again. Notes
Tips
|
|
|
|
|
|
Related Items |
|
|
©2007 Estek Ltd. All trademarks are property of their respective owners |
|