SCHEDULE SUMMARY
An overview
of the whole job
The Schedule
summary shows each of the Bills that make
up the Schedule along with the values that make up the total cost for
that Bill. The totals for all Bills are shown at the foot of the screen.
Get to know the power of the features in the Schedule Summary, they can
save you a lot of work.
After you've
priced your Bill(s) you may want to check that the breakdown reflects
the totals you expect for this job.
Main Features
- Each Schedule
Bill shown together with breakdown values
- Display
Net, Gross or Profit values
- Force
Recalculation option
- Change
Bill order by dragging to required position (use 1st column only)
- Drill
down to any Bill for checking/updating
- Graphic
view for an easily visual comparison
Load the
Schedule Summary table and select a sample Schedule if not already loaded.
- Notice
that each bill is split into Resource
Types with totals for each
- You can
drill down on values shown in teal (green) to view the component parts
(and of course make any changes required). Be careful, this can take
you several data levels, but it is a very powerful way of checking and
adjusting your work.
- You can
copy complete Bills and even blocks of Bills. This is extremely useful
for copying bills from an existing Schedule to a new, similar job.
- To select
all Bills, click on any column header. You can than use the Copy function
to copy them into memory.
- Select
another Schedule and use the Paste function to insert the Bills at the
cursor. Everything associated with the source Bills are copied to the
new Schedule - potentially very powerful!
Tips
- Use the
Summary view as a quick check that Bill totals conform to expectations.
- Use the
Chart function to see Bill totals in an easy to read graphical form.
- Use this
view to copy Bills to another Schedule (You can copy by block)
|